400c Crawler Type Water Well Drilling Rig for Sale & Chest Rig
Basic Info
Model NO. | 400c |
Certification | ISO 9001:2000 |
Condition | New |
Motor | Diesel |
Drill Hole Diameter | <100mm |
Drill Hole Depth | >200m |
Bit Type | Diamond Bit |
Drilling Way | Rotary |
Type | Crawler |
Diesel Engine | 93kw (Cummins) |
Working Air Pressure | 1.05-2.46MPa |
Model | 400c |
Drill Diameter | 110-325mm |
Air Consumption | 16-34 M³/Min |
Drill Rod Length | 3m |
Lifting Force | 12t |
Transport Package | Standard |
Specification | 6*2.1*2.8m |
Trademark | GLORYTEK |
Origin | Beijing China |
Production Capacity | 20000piece/Year |
Product Description
400C Crawler mounted well drilling machine
Technical Parameter
Model | 400C |
Max. drill depth | 250m |
Drill diameter | 110-325mm |
Diesel Engine | 93KW (Cummins) |
Working air pressure | 1.05-2.46MPa |
Air consumption | 16-34 m³/min |
Drill rod length | 3m |
Drill rod diameter | 89mm/76mm |
Axial pressure | 5t |
Lifting force | 12t |
Slow lifting speed | 4m/min |
Fast lifting speed | 14.5m/min |
Slow feed speed | 6.2m/min |
Fast feed speed | 25m/min |
Rotation torque | 5700-6600Nm, 2820-3300Nm |
Rotation speed | 0-90r/min, 0-180r/min |
Drilling Method | Downhole hammer or Mud Drilling |
Travel speed | 3.5Km/h |
Grade ability | 21° |
Weight | 7.8 t |
Whole dimension | 6×2.1×2.8m |
Application formation | Unconsolidated layer or bedding rock |
Drill method | Down the hole or mud pump drilling |
Hammer | Medium or high air pressure series |
Advantage
1. Move easily & good mobility
2. Simpleoperation & high efficiency
3. Commercial Price.
Application
1. Drilling wells for urban and rural life
2. Drilling wells for agricultural irrigation and industries
3. Drilling for geotechnical survey
4. Drilling construction engineering holes
5. Drilling geothermal pump wells
Structure Features:
1- Diesel engine-driving hydraulic system. Travel, rotate, feed, hoist, land, lift, unload, and so on all are run by Hydraulic components.
2-Working unit consists of feed system, slide guide(mast),top-driving rotary head, slide plate,centering apparatus, unloading system, hoisting system, etc.
3-Axial pressure, feed speed and rotation speed are adjustable.
4-Crawler self-driven structure travel mode, easy to move. Use crawler chassis. Steel track link(Inlaying rubber block is in option which is easy to travel on city streets)
5- During operation, four hydraulic landing legs will adjust the rig body level and stability
6- Four extra high landing legs are available, during long-distance transportation loaded with vehicle,it can be moved onto the vehicle directly and easy for transportation, no need to be loading or lifting.
7-Auxiliary hoist can list items within 1 ton (such as drilling tools, tools, etc), and also help to load or unload drill rod and drill tools.
8-The slide guide can be fixed with the body during operation in order to improve the operating stability of the mast.
9-Level instrument and dedicated centering apparatus ensure the perpendicularity and accuracy of the drilling hole.
10- Compressed-air system provides special oil mist lubricator to lubricate the impactor and longer the serving life of it.
PackingRelated Product
Our Company & Service
Glorytek Industry (Beijing)., located inBeijing,China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
Customer photos
FAQ
Q: How can we choose a suitable water well drill rig?
A: We normally recommend a suitable model according to drilling depth, drilling hole dia. and layer condition on site.
Q: Are you a factory or a trading company ?
A: We are an integrated corporation specialized in manufacturing and exporting.
Q: What is your payment terms?
A: We can accept T/T,L/C.
Q:.What is your MOQ? How long is the delivery time?
A: Our MOQ is 1 sets. Normally for drill rig, the delivery time is about 25-30 days after receiving payment, the drilling tools would be about 3-5 days.
Q:. How long is the warranty?
A: The guarantee period for mainframe is one year (excluding the quick wear parts).
Q: Can we print my Logo on the products?
A: Yes, we can. We support OEM .
Contact
Sunny Dong(Sales Representative)
Glorytek Industry (Beijing)Address:No.B-2507, DongWeiCheng, GuanZhuang,Chao Yang District, Beijing, China. Website: glorytek.en.made-in-china.com / glorytek.en.made-in-china.com